Synergy 8200 - Jeep XJ 4-Link Long Travel System Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Do samochodu Synergy 8200 - Jeep XJ 4-Link Long Travel System. Synergy 8200 - Jeep XJ 4-Link Long Travel System User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 22
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
INSTALLATION INSTRUCTIONS
PPM-8200 XJ LONG-ARM SUSPENSION
GENERAL NOTES:
These instructions are also available on our website; www.synergymfg.com. Check the website before
you begin for any updated instructions and additional photos for your reference.
Cutting and grinding of stock control arm brackets is required for installation.
Brackets can be bolted or welded on.
Loosely bolt all hardware in until all bolts have been started, then torque to spec.
This kit is designed to be run at a minimum of 4” of lift and requires the use of a 4” bump stop spacer to
prevent track bar interference at full compression travel.
A Slip Yoke Eliminator kit will likely be needed in the rear for lift heights above 4”
PARTS LIST:
8230 XJ LONG ARM FRAME BRACKET
(1) 823001-L
(1) 823001-R
(2) 823002 XJ Long Arm UCA nut tab
(12) 3/8-16 UNC x 1” long hex head bolt
(12) 3/8-16 UNC Nylock nut
(24) 3/8” flat washer
(4) 3/8-16 UNC x ¾” long thread cutting screw
(4) 9/16-12 UNC x 4” long hex head bolt
(2) 9/16-12 UNC Stover Nut
(6) 9/16” flat washer
(2) 9/16” lock washer
8231 XJ LONG ARM LOWER CONTROL ARM (PAIR)
(1) 8231-01-L Left Lower Control Arm, XJ Long arm (Assembled)
(1) 8231-01-R Right Lower Control Arm, XJ Long Arm (Assembled)
8232 XJ LONG ARM UPPER CONTROL ARM (PAIR)
(1) 8232-01-L Left Lower Control Arm, XJ Long arm (Assembled)
(1) 8232-01-R Right Lower Control Arm, XJ Long Arm (Assembled)
8233 XJ FRONT TRACK BAR BRACKET AND BRACE KIT
Przeglądanie stron 0
1 2 3 4 5 6 ... 21 22

Podsumowanie treści

Strona 1 - INSTALLATION INSTRUCTIONS

SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 INSTALLATION INSTRUCTIONS PPM-8200 XJ LONG-ARM SUSPENSION GENERAL NOTES: 

Strona 2

At this point, carpet and seats can be reinstalled into the vehicle as all drilling into the passenger compartment is finished at this point. 9)

Strona 3

10) Next, install the upper control arms (PPM-8232). Again, see above picture for reference on arm orientation. Slide the nut tab, 823002-01, betw

Strona 4

PPM-8233 TRACKBAR INSTALLATION 14) Remove the stock trackbar and track bar bracket on the chassis. The track bar bracket attaches to the chassis via

Strona 5

16) Before installing the PPM-8233-03 trackbar itself, the trackbar mount on the axle needs to be modified. Begin by drilling out the trackbar bolt

Strona 6

17) The PPM-8233-03 track bar can now be fully installed. 18) Last of the kit to install is the PPM-8233-02 track bar brace. Install using the 4 ½

Strona 7

19) At this time, install 8057-40 bump stop spacers. Follow instructions included with the 8057 kit for details. This is also a good time to cycle

Strona 9

This is how the spring hanger should look after the first cuts. 3) Next, remove the inner part of the rear spring hanger by first locating the appr

Strona 10

a. Note the red square near letter A which encompasses the remainder of the forward section of the spring hanger. This piece of the bracket will

Strona 11

a. Test fit the new spring hanger and grind smooth any other interfering bracketry. (If welding the bracket on as well, mark and clean the desired

Strona 12 - TRACKBAR INSTALLATION

 (1) 823301 XJ Front Track Bar Bracket  (1) 823302 XJ Front Track Bar Brace  (4) ½-13 UNC x 1.5” long hex head bolt  (4) ½-13 UNC Stover nut 

Strona 13

6) With the hanger positioned, begin drilling the ten 3/8” holes, using the hanger as a guide to bolt the hanger to the body 7) Once all 10 holes

Strona 14

Top view of spring hanger bolts, looking down under the rear seat. 8) If welding of the bracket on is desired as well, clean the areas desired to w

Strona 15 - PPM-8240

9) Paint any areas of bare metal exposed, secure fuel and brake lines and reinstall rear suspension. a. Install the 4.5” long 9/16” bolt provided

Strona 16

 1/2-13 UNC : 80 ft/lbs  9/16-12 UNC : 110 ft/lbs  3/8-24 UNF : 40 ft/lbs 1. Jack up the front of the vehicle by placing the floor jack under

Strona 17

The control arm brackets consist of several layers of sheet metal and can be removed in approximately 4 cuts. Cut 1 (Outer Edge): Cut 2 (Back Edge)

Strona 18

Cut 3 (Inside Edge):

Strona 19

Cut4: Cut off any remaining pieces of the bracket so that the bottom of the unibody looks like this. This is also a good time to grind smooth all e

Strona 20

4) Once the stock control arm mounts have been cut / trimmed, installation of the new PPM-8230 control arm bracket can begin. 5) First, support

Strona 21

Close up of cut line. 6) NOTE: PULL UP CARPETING IN BOTH DRIVER AND PASSENGER FOOTWELLS PRIOR TO DRILLING HOLES! This is much

Strona 22

7) Drilling mounting holes. Begin by drilling the 3 forward outer and inner holes to 3/8” This is easiest to do with the bracket being held in plac

Komentarze do niniejszej Instrukcji

Brak uwag